To increase the use of renewable energy Ports of Stockholm has chosen to commit to solar cell systems. The company currently has five facilities and the ambition is to increase the production of solar power.
Ports of Stockholm's solar cell systems can produce electricity at a cost that is comparable to the purchase price of the electricity market. The facilities have a guaranteed effect of at least 25 years.
Facts about the facilities
System
Number of solar panels
Solar cell surface area, m²
Maximum power output, kW
Electricity produced, kW/year
Frihamnen port, Magasin 6
885
1,400
225
200,000
Port of Nynäshamn
500
800
125
125,000
Port of Kapellskär
255
400
60
55,000
Värtahamnen port
166
270
55
55,000
Stockholm Norvik Port
1,610
3,600
605
560,000
Total
3,416
8,551
1,070
995,000
Frihamnen port - Magasin 6
885 solar panels
Total solar cell system surface area: 1,400 m²
Maximum power output: 225 kW
Estimated annual electricity production: 200,000 kWh
Total cost of facility: SEK 3 million Ports of Stockholm was granted 35 percent (SEK 1 million) in state subsidies
Cost per installed kW: SEK 8,900 (including subsidies)
Värtahamnen port - the Värta Terminal
166 solar panels
Total solar cell system area: 270 m²
Maximum power output: 55 kW
Estimated annual electricity production: 55,000 kWh
Total cost of facility: SEK 870,000
Cost per installed kW: SEK 15,800
Port of Nynäshamn - the Port Office
500 solar panels
Total solar cell system area: 800 m²
Maximum power output: 125 kW
Estimated annual electricity production: 125,000 kWh
Total cost of facility: SEK 1.4 million Ports of Stockholm was granted 35 percent (SEK 480,000) in state subsidies
Cost per installed kW: SEK 7,400 (including subsidies)
Port of Kapellskär - Custom's building
255 solar panels
Total solar cell system area: 400 m²
Maximum power output: 60 kW
Estimated annual electricity production: 55,000 kWh
Total cost of facility: SEK 1.17 million
Cost per installed kW: SEK 19,400
Stockholm Norvik Port
1,610 solar panels
Total solar cell system area: 3,600 m²
Maximum power output: 605 kW
Estimated annual electricity production: 560 MWh
Total cost of facility: SEK 3.720 million
Cost per installed kW: SEK 6,150